mirror of
https://github.com/hasura/graphql-engine.git
synced 2024-12-18 04:51:35 +03:00
64 lines
1.7 KiB
ReStructuredText
64 lines
1.7 KiB
ReStructuredText
|
.. meta::
|
||
|
:description: Upgrade to Hasura migrations v2
|
||
|
:keywords: hasura, docs, migration, metadata
|
||
|
|
||
|
|
||
|
.. _migrations_upgrade_v2:
|
||
|
|
||
|
Upgrading to Hasura migrations config v2
|
||
|
========================================
|
||
|
|
||
|
.. contents:: Table of contents
|
||
|
:backlinks: none
|
||
|
:depth: 2
|
||
|
:local:
|
||
|
|
||
|
What has changed?
|
||
|
-----------------
|
||
|
|
||
|
In **config v1**, the PG schema migrations and Hasura metadata were both handled
|
||
|
using the same :ref:`migration files <migration_file_format_v1>` which were in
|
||
|
``yaml`` format. In **config v2**, these are managed separately in their own
|
||
|
directories in the Hasura project. Metadata is managed in its separate
|
||
|
:ref:`metadata directory <metadata_format_v2>` and PG schema migrations are
|
||
|
managed via :ref:`migration files <migration_file_format_v2>` that are now in
|
||
|
``SQL`` format.
|
||
|
|
||
|
Changes to exising workflows
|
||
|
^^^^^^^^^^^^^^^^^^^^^^^^^^^^
|
||
|
|
||
|
Due to the above mentioned changes, any workflows that involve applying migrations
|
||
|
have an additional step of applying metadata as well.
|
||
|
|
||
|
For example,
|
||
|
|
||
|
- any place where the ``hasura migrate apply`` command is used, it now needs
|
||
|
to be followed by a ``hasura metadata apply`` command.
|
||
|
|
||
|
- if the ``cli-migrations`` Docker image is used for :ref:`auto applying migrations <auto_apply_migrations>`
|
||
|
at server start, now the ``/metadata`` directory will also have to be mounted
|
||
|
|
||
|
Upgrade steps
|
||
|
-------------
|
||
|
|
||
|
Step 1: Upgrade to the latest CLI
|
||
|
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
|
||
|
|
||
|
Config v2 is available since ``v1.2.0``.
|
||
|
|
||
|
Run:
|
||
|
|
||
|
.. code-block:: bash
|
||
|
|
||
|
hasura update-cli
|
||
|
|
||
|
Step 2: Upgrade hasura project to v2
|
||
|
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
|
||
|
|
||
|
In your project directory, run:
|
||
|
|
||
|
.. code-block:: bash
|
||
|
|
||
|
hasura scripts update-project-v2
|
||
|
|
||
|
Your project directory and ``config.yaml`` should be updated to v2.
|