Case studies
Note: Most of these still aren't started, because the baseline simulation in the relevant area isn't working. Unknown traffic signal timing, bad guesses at the amount of off-street parking, lanes tagged incorrectly in OpenStreetMap, and simulation bugs cause unrealistic gridlock. It's hard to evaluate a change without a realistic baseline.
In progress:
- Stay Healthy Streets: Lake Washington Blvd
- West Seattle mitigations
- Simplify where the Burke Gilman crosses Corliss and Pacific
- No write-up yet, but the proposal is included in A/B Street
TODO:
- Close Broadway and Pine to through-traffic
- proposed here
- partly happening already
- another proposal
- Traffic signal timing at Montlake/520 and Montlake/Pacific
- Walking around here is frustrating, and pre-COVID, vehicle traffic got fairly stuck
- Pedestrianizing the Ave (u-district)
- I can't find the proposal anymore; maybe this?
- Eastlake bike lanes / RapidRide J
- Madison / RapidRide G
- See here
- Bus lanes on Denny
- Proposed here
- Bike Master Plan
- Prototype the planned network
- Downtown one-way snake
- An old crazy idea I've always wanted to try
- Unsorted ideas